Publishing a Proposal Without Losing Your Mind


Article Written By: AtomicInteractive

Add Your Picture Rhonda Wright says, Proposal publishing is an art. It has to be, when you re given five days to publish 1,000 pages.” As with any art, what you learn from the masters has to be practiced and then adapted to suit your own needs.

Designate a project coordinator

Want a recipe for disaster? Go lean and bring on one freelance editor to proofread your proposal. Then assume that he can format your proposal, make coffee, and—oh, yeah—organize your production schedule and workflow. An astonishing number of companies operate in exactly this fashion.

A better way? Assign a dedicated project coordinator to oversee your production schedule and publication process end to end. Having someone manage the details of production lets the head honchos like proposal managers focus on their core responsibility: developing a winning proposal strategy. And it lets your production staff edit, design, and format the document without distraction.

Ideally, your coordinator should be a trained proposal specialist who understands the intricacies of an RFP (request for proposal) and can manage a production workforce of 10 to 30. At minimum, he or she should be highly organized, flexible, and accustomed to working under stiff deadlines.

In addition, Margo Goldman says, coordinators have to have the right personality. They need have to have a certain authority, a certain assertiveness. When they say 'no, people need to know that they mean it.” Carolyn Quinn points out that a coordinator also must be able to stay calm in tense situations.” Or as Rachael Neenan puts it, No matter how difficult the situation, you can never blow your stack. Staying professional is so important, because everyone else on the team reacts to you.” In other words, if your proposal coordinator loses it, your whole staff is going to lose it, too.

Add key staff

In addition to a project coordinator, you need two other professionals: an editor and a desktop publisher. The proposal editor will develop a style sheet (sometimes called the wall of truth”) for the proposal and edit the document itself. The desktop publisher will develop a style-based template for the proposal (usually in Microsoft Word), format text, and integrate numerous files into one. The desktop publisher, who should be skilled in graphics software, will also build the figures used in the proposal.

If your proposal is of substantial size (say, over 100 pages), these leads will also oversee the work of other editors and desktop publishers assigned to the effort. Because the leads carry so much responsibility, it doesn t pay to force-fit someone into the job who s not fully qualified. According to Wright, Your leads need to be true experts who know what they re doing. Using people who aren t publishing professionals can be very costly—and can ultimately jeopardize the proposal.”

By the way, you don t think your proposal needs to be edited? Maybe not, if you don t mind your client reading that hunan resources and a pubic key infrastructure are part of your solution.

Schedule production in detail

A production schedule should work backward from the proposal deadline and incorporate time for writing and revising, designing the proposal cover and the template for the text pages, formatting and laying out the copy, and proofreading, holding author and proposal manager reviews, conducting a final quality check, and printing, assembling, boxing, and delivering the proposal.

It s tempting to forgo putting together a schedule because schedules always slip.” But that s exactly why you need one, and why your project coordinator should map out every interim deadline that s required to get from project start to completion. When these deadlines slip, you ll indeed have to reconfigure your schedule. But you ll know clearly where you are and what still must be done to meet your final deadline.

What to do when your schedule is drifting out of control, but the higher-ups don t seem to care? Remind them of the dollars being wasted by the extra hours spent. If somebody decides at the eleventh hour to change the proposal s template,” Wright says, a coordinator can explain that making such a change will take a certain number of hours—at a certain number of dollars per hour. When the bosses do the math, chances are they ll drop the idea.”

Hold standup staff meetings

Getting your team together for just 10 minutes in the morning and 10 minutes in the afternoon can save hours of wasted effort that comes from misunderstanding priorities or job specifications. The purpose of a standup? To assess progress against interim deadlines, assign priorities for the day, answer questions, and adjust your schedule as needed to ensure that the project remains on track. The project coordinator should lead the meeting, and all key production staff should attend.

By the way, a standup” meeting means just that—everyone should stand up. Keeping people on their feet nearly guarantees that meetings stay short and focused.

Use progress-tracking logs

Your proposal is 800 pages long, is being written by 23 authors, and is currently divided into 140 separate Microsoft Word files. Do you know where Section II.13.B.iv is?

If you religiously maintain a tracking log, you will. Your log should list every single piece of the document, including the cover, spine, and back cover; the tabs and tables of contents; the cover letter; every text section, broken out by volume, section, and subsection; and all supplemental material, such as appendices and attachments. Your log should track the progress of each piece through each step of the publishing cycle, including writing, editing, formatting, author reviews, and quality checks.

Wright says that she expects her project coordinators to know the status of every single piece of a proposal during every minute of the production cycle.” Her coordinators tracking logs allow them to do so.

One of the additional benefits of this system, says CSC s Ginny Furth, is that it s standardized and used on all the department s proposals. I can hand off a project I m working on to any other coordinator who s been trained in the process,” says Furth. They can keep the project flowing through the evening, so I don t have to be at the office 24 hours a day.”

Control workflow and versions

Your editor has spent six hours polishing the executive summary when the proposal manager proudly hands you his rewrite of the file. Guess what? You ve just lost version control.

To avoid these unhappy moments, you need a system for moving files through the production process and ensuring that only one person is handling a file at a time. Your system can be as simple as placing each section of the proposal in a manila folder and not allowing people to work on a section unless they have that very folder in front of them. Or you can load your files into an electronic document-sharing system like Microsoft SharePoint, which allows only one person to check out” and work on a file at a time.

One of the things that can really do you in on a proposal is if you lose version control,” says Quinn. When authors send us a file to work on, we tell them, 'That s it, this is our file now, we own it, don t do anything else to it. We make it very clear who has control over a file at any given time.”

Schedule a relief shift

It s not unusual for Goldman to schedule freelance editors to start on a large project at 6:00 p.m. on a Friday or 9:00 a.m. on a Sunday. As soon as she sees that work will flow outside regular business hours, she rings up her freelance staff and books a second shift.

The way that we ve avoided burnout over the years is that we have an extensive vendor network,” Goldman says. We use a lot of temporary support, both for editing and for design. We try to be very careful about the hours that people work, and we really step up and add staff to spell people when they need it.”

Incorporating a second shift into your production schedule allows more work to be done on a given day while avoiding the lowered productivity and increased errors that come from working your production staff 12 or 15 hours a day for weeks at a stretch. It also helps keep your most important professionals fresh and focused when they are on the job.

I am a huge proponent of the life-work balance,” says CSC s Wright. We have people who have worked for a us for a long time and who also have spouses and children. People like that aren t going to stick around if we aren t flexible with their schedules. We ask our staff to go out on a limb for us, and we have to be willing to do the same for them.”

Proposal groups that don t operate like this are known as body shops,” and they regularly place multimillion dollar deals in the hands of production staff fueled only by a few cups of coffee and a few hours of sleep. Lots of places do it. But that doesn t make it any less risky.

Know when to say no

Quality is a goal, but the deadline is the supreme goal. Proposals submitted to the federal government minutes late have famously been rejected—leaving the submitter with reams of paper and hundreds of thousands of dollars in publishing costs down the drain. Publishing a proposal is not like publishing a novel,” says CSC s Ginny Furth. It s not going to be read over and over through generations.” When a deadline is in jeopardy, she says, I am not above pulling a folder out of somebody s hands.”

Goldman says, Carolyn and I are top-notch editors, but we are also extremely practical people. We know when to let go, and at the end of a project, we will not bother with the trivial.”

Last-minute changes to a proposal should be made only if they address RFP compliance issues or resolve errors that are egregious enough to threaten the deal. In other words, should production be held up to insert a missing serial comma? No. To fix a typeface smaller than that allowed by the RFP or a misspelling in the client s name? Yes.

Leave ample time for printing

Remember that the final step of publishing—printing, assembling, and boxing a deliverable—always takes more time than you expect. SMandA s Neenan says one of her pet peeves is that everyone thinks that printing magically happens in five minutes. Even people who have been in the proposal business for 15 years consistently underestimate the time that s required.” For a large proposal, Neenan recommends building a full day into the schedule dedicated solely to printing and prepping a document for delivery. And by a full day, she means a standard business day— not from 5:00 p.m. one day until 5:00 a.m. the next.”


About the Author

Samantha Enslen runs Dragonfly Editorial, an editing and
copywriting firm that specializes in proposals, corporate communications, scientific and technical publications.



You Can Link Directly to "Publishing a Proposal Without Losing Your Mind" by using the url:
http://www.allbestarticles.com//writing-and-speaking/copywriting/publishing-a-proposal-without-losing-your-mind.html

This Article Has Been Published on Wed, 23 Dec 2009 and Read 190 Times


Find All Best Articles at http://www.allbestarticles.com








Rating: Not yet rated



Comments

No comments posted.

Add Comment

You do not have permission to comment. If you log in, you may be able to comment.

Related information on Copywriting

Using Copywriting to Provide Valuable Engaging and Relevant Material to Your Customers
Scoring a hatrick - the three goals method of copywriting
Once upon a time telling a story on your website
How to win customers and influence people
Zen and the art of writing killer headlines
The ghost in the blogging machine
Is Just Okay good enough?
How not to suck at copywriting
A trip down memory lane Revisiting your copy
3 reasons why your UK copywriter has to know about social media
Lifting The Lid On Professional Online Copywriting Services
Creating Editorial Style Sheets
Creative Writing: It is all about experience!
6 Steps of a Quality Editorial Process
Publishing a Proposal Without Losing Your Mind
The Job of a Copywriter
Simple Copywriting Trick
Work At Home Earning Multiple Streams Of Internet Income
Opportunity for Freelance Copywriters
The Perfect Way to Alleviate End of the Day Slumping